Patio Progress #2

Well, the pattio project has been going for about 3 months now, and we have achieved quite a lot. With the pattio area now flat, bottom and boundary walls installed, and steps over half way, we should have most of it finished in the next 2 months. Three lights have been installed and the wiring is in place. The strip light for the steps arrived last week, which I got manufactured especially for the pattio with half the normal brightness. This is because there is a total of 40m of strip light, and the normal brightness would be way too much. Once the steps are in, which should be about 3 weeks away, the strip lighting will be installed. I can’t wait!

Posted in Our House at July 8th, 2010. No Comments. - 996 views